Invitation to Participate in Dialogue (“ ITPD”) (the tender process).Our consideration of this includes:Ī) At Section 4.2, we summarise the standards relating to air ventilation which were relevant to the Project and provide the relevant extracts from SHTM ī) At Sections 4.3 to 4.5, we consider whether the design specifications with regard to air ventilation were referred to at each stage of the key stages of the Project being: It was agreed that KPMG would not undertake a technical review in this respect but confirm that the Standards were included within the design specifications.Ĥ.1.1 In this Section, we have considered the extent to which the design specification with regard to air ventilation included reference to, and complied with, the SHTM at each stage of the Project. To determine the extent to which the design specifications with regard to air ventilation complied with the SHTM standards, and specifically SHTM 03-01, being the ventilation for healthcare premises standards, at each stage of the Project. 4 Design specifications and air ventilation standards
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |